KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  10-30-2019
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Install Instrument Panel

1200 - 1500

Install barrier strip busses for lighting. These will be used to bus the three separate lights to one wire from the VPX , as recommended by AeroLeds. Each bank of 3 is bussed together for Nav, Strobe, Ground, and Sync. Three banks of 2 are also bussed to join the landing lights, taxi lights, and recog lights.

These strips were secured to the previously fabricated shelf.

Installed the shelf to the ECU mounts using locknuts.

Install Adel clamp to support aux fuel pump wiring.

Install aux fuel pump relays to shelf using an hardware.

Route antenna coax for VOR/Nav/Loc and GDU460.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.