KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  7-27-2019
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Install Overhead Console Wiring

1400 - 1612

I received the overhead switch panel from steinair. They did the CF overlay, drilled holes, engraved, and clear coated the panel.

I decided to use Honeywell TL switches throughout as all of the locking toggles were from this series. Installed four 1TL1-2 ON-OFF switches in panel. Installed one 2TL1-10A switch for the taxi/landing light control. Installed PWM controller for the glareshield fans.

I needed to clean up all of the drilled holes to final diameter.

A spacer was fabricated for the PWM controller shaft as it was a split shaft. The spacer fits in the split and prevents the shaft from deforming when the knob set screw is tightened. The knob was then clocked and installed.

Next I terminated the fan wiring with a 4 position Deutsch connector. The matching connector in the overhead was also installed. The system was powered and connected then checked for proper operation.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.