KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  2-23-2019
Number of Hours:  5.20
Manual Reference:  
Brief Description:  Install Garmin GAP 26 Regulated Pitot

1100 - 1612

Today, Dad and I installed the new regulated GAP 26 pitot tube. We spent some time trying to fit the pitot in the mast and plug in the plumbing and the wiring. We came to the conclusion that an inspection plate was the optimum solution to the connection issues.

Once the decision was made to create an inspection plate, we set about fabricating the cover and doubler. The hole we created is large enough to reach into for connection purposes. Standard techniques were used to fabricate the cover and doubler. This process has been previously detailed.

Once the doubler was finalized, it was primed and installed using a p-squeezer and flush rivets.

The GAP 26 regulator was then installed on the inspection plate cove with fulsh #6 screws.

Next we will complete the plumbing and wiiring.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.