KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  12-13-2017
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Install Oil Door

1530 - 1800

First thing today was to take the baffling to the powder coating company.

Work began again on the oil door.

The cowling was marked and cut using standard techniques.

A layer of SORIC fabric was cut as well as a layer of 9 ounce f/g cloth.

Cover cowlinf area with packing tape.

The f/g cloth and SORIC were wet out and applied to the oil door.

The door was then installed using tape to hold it in place while the epoxy cures.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.