KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  4-14-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Install Firewall Pass Throughs

Locate and create holes in firewall for cable pass thru.

Holes were created using knockout punches of appropriate size.

The pass through for the EFII components was made from a SS pipe flange obtained from McMaster. It was shortened and machined on the Smithy to reduce weight. The flange was then drilled for 8-32 hardware.

I received a mock up of the B & C standby alternator. The mockup was installed to verify nominal fit and clearance with the Airwolf remote oil filter adapter.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.