KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  1-16-2017
Number of Hours:  1.30
Manual Reference:  48-19, 48-20
Brief Description:  Install Noseg Gear Fairing

1624 - 1742

Using packing tape, prepare the forward fairing for epoxy fill and creation of aft fairing fill piece.

I decided to create the fill piece from epoxy/milled glass/cabo instead of riveting a scap piec in.

I also needed to fill several mis aligned holes in the forward fairing flange.

While the epoxy was setting, I cut out the nose gear leg fairing trim templates.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.