KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
' style=
Date:  8-30-2016
Number of Hours:  2.30
Manual Reference:  
Brief Description:  Prepare Cabin Top for Window Installation

1330 - 1548

Prepare cabin top window flange for window installation.

Using multiple sanding tools, square up and shape the window flange, 4x.

Mix epoxy/cabo/micro and fill pits and scallops in edge.

Apply epoxy filler to right rear window surround to yield an 1/8" flange depth.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.