Powered By Kitlog Pro v2.0
Bobs Ten
RV-10
All
8-12-2016
< Previous Log Entry
Next Log Entry >
Date:
8-12-2016
Number of Hours:
3.00
Manual Reference:
Brief Description:
Install Heat Valve Actuators
1630 - 1930
Today was a HUGE day...sent the deposit on the engine!!!!
Install Actuonix Linear actuators on heat valves.
Machine bushings to prevent interference using Smithy, 4x.
Using stainless hardware, attach actuators to heat valve control arms.
Setting a temporary end point on actuator, located mounting point on firewall.
Drilled firewall and mounted actuator pivot mount.
Verify operation of heat valves.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1466
2834
Access Panels
24
49
Aileron
2
3
Aileron Actuation
17
28
Avionics
154
396
Baggage Area
26
38
Baggage Door
9
17
Bottom Wing Skins
9
21
Brake Lines
13
19
Brakes
7
15
Cabin Top
100
165
Control System
28
57
Cowling
66
147
Doors
94
174
Electrical
103
219
Elevator
64
76
Empennage
3
6
Empennage Attach
23
36
Empennage Fairings
26
33
Engine
114
249
Engine Start Prep
5
35
ER Fuel Tanks
28
55
Fairings
54
108
Flaps
8
12
Flight Controls
2
10
Floor Panels
1
4
Front Fuselage
2
5
Fuel Lines
24
40
Fuel Tanks
3
8
Fuselage
18
60
Heat Valves
13
31
Horizontal Stab
49
54
Instrument Panel
21
62
Interior
15
39
Inventory
7
25
Landing Gear
6
16
Lighting
3
8
Miscellaneous
17
55
Moving
2
6
Practice Tool Box
2
4
QB Fuselage
21
38
Rear Spar
1
0
Rudder
33
27
Rudder Pedals & Brak
15
28
Rudder Pedals and Br
1
1
Seat Backs
7
14
Seats
4
10
Shipping
1
1
Tailcone
90
103
Tailcone Attachment
2
5
Tools
1
2
Top Wing Skins
2
1
Vertical Stab
26
28
Wheels
3
8
Windows
8
21
Wing
4
6
Wing Attach
30
49
Wing Ribs
1
1
Wing Spar
1
2
Wing Tips
19
38
Wings
34
66
Copyright © 2001-2024 Matronics. All Rights Reserved.