I pinned the right aileron belcrank in the neutral position, then adjusted the control rod length to suit. When that was done, per the plans, I carefully die ground some more material away from the aft spar passthrough until 1/16" clearance was achieved at the end of travel in both directions (28 degrees up and 14 degrees down).