KitLog pro

Powered By Kitlog Pro v2.0

Stuarts Web Site
' style=
Date:  12-21-2009
Number of Hours:  0.01
Manual Reference:  
Brief Description:  Crankcase repair

Crankcase repair

Today James and I collected the crankcase from CG Engineering. The whole crankcase was dye penetrant inspected, the crankshaft and camshaft journals were rewelded and machined, the mating faces machined, tunnel re -bored, the larger dowel STC incorporated and then the crankcase was Alodined ready for re-assembly and painting.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.