KitLog pro

Powered By Kitlog Pro v2.0

Stuarts Web Site
' style=
Date:  8-19-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Plenum dipstick access well

Plenum dipstick access well

I shaped the timber and the top of the melamine to the curve of the plenum top with the linisher, sanded smooth, waxed a few times, applied PVA agent and let everything dry. They I layed up lots of small bits of glass, adding the flanged tube after three layers. When everything was glassed, I iced the top with a mix of epoxy and Aerosil 200 filler so that I can sand the flange smooth to get a good seal with the plenum top (RTV will help there too). I don't mind extra epoxy collecting in the bottom, as this will help me smooth the lining and make it easier to remove residual oil with a cleaning rag.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.