Date:  7-19-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  DRDT-2 C-frame construction

DRDT-2 C-frame Construction

Welded the C-frame together per the plans, but with the addition of a flat bar strap running full height up the spine of the frame (mostly for cosmetic reasons - to block off the open tubes). The beams are so large that the edge radius took a lot of TIG filler wire (I will grind everything flush before sandblasting and painting).

Ground the sides flush and painted with hammertone finish.
' style=

Lots of metal - big gaps - lots of weld !

Lots of metal - big gaps - lots of weld !

' style=

Alignment testing

Alignment testing

' style=

Finished off in hammertone paint

Finished off in hammertone paint