This evening I drilled the holes for and mounted the fuel drain, the vent line and outlets ports, then installed the centre inspection plate. When the ProSeal sets, I'll do a final internal inspection and then install the remaining two inspection ports ready for leak checking, match drilling upsized holes in the wing, dimpling, countersinking and nutplates.