KitLog pro

Powered By Kitlog Pro v2.0

Stuarts Web Site
' style=
Date:  8-13-2016
Number of Hours:  1.50
Manual Reference:  
Brief Description:  02 - Gear leg stiffeners

Gear leg stiffeners

Next we bonded each ally tube into its recess, then bonded the timber to the back of the gear legs with ProSeal and wrapped tightly with 2mm cord from top to bottom. When that sets, we'll trim away the excess, then wrap the whole lot with 2" fibreglass tape and epoxy.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.