The nutplate hole spacing was slightly off in my previous drawings, so James and I fixed that first, then programmed the mill to cut another tip tank inspection panel. Unfortunatley, the cut depth was inconsistent (gantry slippage at one end), so I re-adjusted the gantry, cut the centre out and turned it into a doubler instead.