Tonight Tony and I riveted the inboard three ribs in place. They are supposed to be riveted one at a time in assembly with the bottom skin, but I can reach the aft spar down the gaps, so I went ahead and installed them so we could install the fuel line, pitot and AoA lines plus heater wires, SCAT for the NACA scoop etc.