KitLog pro

Powered By Kitlog Pro v2.0

Rob and Haruko RV-12 N73HR
' style=
Date:  11-6-2010
Number of Hours:  4.00
Manual Reference:  23-02
Brief Description:  bent and startied drilling left longeron.

Bent left longeron--this went considerably faster than the right logneron. Match drilled the horizontal flange Began prep of right fuselage skin and clecoed in place.
' style=

Longeron in bending jig in vise

Longeron in bending jig in vise

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.