Installed nutplates on rear baggage bulkhead and stiffeners. Installed bulkhead to rear of fuselage asembly, and attached rollbar brace. Attached tank attache angles. Prepped shoulder strap lugs. Removed rudder, verticle stabilizer, and horizontal stabilator from tailcone in preparation for tailcone/fuselage attachement.