Completed riveting fuse bottom skin and associated doubler plates. Match hole drilled and installed step attach angles and trial fit steps.Riveted the forward bulkhead, step floors and assoicated nutplates. Installed snap busighins , rear bulkhead, and autopilot brackets.Started installed ytesm block studs, but need some assistance.