Powered By Kitlog Pro v2.0
Allens Web Site
RV-7
Fuselage
5-2-2008
< Previous Log Entry
Next Log Entry >
Date:
5-2-2008
Number of Hours:
2.00
Manual Reference:
Brief Description:
Installled the Battery bus bar.
Trimmed the side so that the right hand lower bar did not interfer.
Cut and installed the scat tube for the air vents.
Cut the 2 inch hole in the firewall for the heater exchanger.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
362
1049
Avionics
11
28
Electrical
9
16
Empennage
40
144
Engine
8
17
Fuselage
180
483
None
1
3
Tools
1
8
Wings
112
350
Copyright © 2001-2024 Matronics. All Rights Reserved.