Powered By Kitlog Pro v2.0
Allens Web Site
RV-7
Fuselage
3-24-2008
< Previous Log Entry
Next Log Entry >
Date:
3-24-2008
Number of Hours:
3.00
Manual Reference:
Brief Description:
High pressure boost pump
Had to re-bend all but one of the fuel lines for the high pressure boost pump.
Flared the ends, and installed the lines.
Stored the empennage parts on the garage ceiling. Needed room in the house.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
362
1049
Avionics
11
28
Electrical
9
16
Empennage
40
144
Engine
8
17
Fuselage
180
483
None
1
3
Tools
1
8
Wings
112
350
Copyright © 2001-2024 Matronics. All Rights Reserved.