Powered By Kitlog Pro v2.0
Allens Web Site
RV-7
Fuselage
3-6-2008
< Previous Log Entry
Next Log Entry >
Date:
3-6-2008
Number of Hours:
5.00
Manual Reference:
sec 8
Brief Description:
front deck
Bent the left and right fuel vent line tubes to fit the aircraft.
Re routed the left and right fuel lines so that they fit better.
Installed the fittings for the break lines in the fuselage.
Installed the break master cylender.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
362
1049
Avionics
11
28
Electrical
9
16
Empennage
40
144
Engine
8
17
Fuselage
180
483
None
1
3
Tools
1
8
Wings
112
350
Copyright © 2001-2024 Matronics. All Rights Reserved.