clamped the trailing edge of fairing closed on the gear legs. trimmed the top and bottom of fairing for proper fit at fuselage, and break lines. Clamped hinge to right fairing. Drilled, clecoed, debured, trimmed hinge to final length, countersunk, and riveted hinge to fairing.