Installed the most inboard rib in the Left fuel tank with Proseal. Prosealed the rivet shop heads.Installed the #4 AN 90 degree fuel overflow fitting to rib with proseal.Ran wires for fuel capacators. Machine countersunk the last few holes in the spar where the forward outboard skin attaches.Primed the edges of the main spar.