KitLog pro

Powered By Kitlog Pro v2.0

Roadster's Web Site
' style=
Date:  9-23-2006
Number of Hours:  3.50
Manual Reference:  6-4
Brief Description:  Preparation for Priming

Today was spent preparing the surfaces of the vertical stabilizer parts for priming. My fingers are literally stiff and sore from rubbing all the surfaces with maroon Scotch-Brite pads. Fortunately, the fine aluminum dust washes off my hands easily with dishwashing soap, and I was wearing a breathing mask to protect my nose and lungs. Below are pics of the shiny, unprepped surfaces and similar parts after they have been scuffed with the Scotch-Brite pads, plus a side-by-side comparison shot. It was a long, boring work session, but I feel like I made good progress.
' style=

Shiny, Unprepped Surfaces

Shiny, Unprepped Surfaces

' style=

Scuffed with Maroon Scotch-Brite Pad

Scuffed with Maroon Scotch-Brite Pad

' style=

Side-By-Side Comparison

Side-By-Side Comparison

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.