KitLog pro

Powered By Kitlog Pro v2.0

Safari Helicopter Construction
' style=
Date:  8-24-2007
Number of Hours:  8.50
Manual Reference:  
Brief Description:  Mounting of Instrument Pod

Most of the day was spent running wires, drilling penetrations in the rear rib and mounting the main instrument panel. The panel was designed to hinge forward slightly to make it less difficult for any maintenance that's required behind the panel. I plan on having some pretty good size service loops in the wire bundles and the pod is quite deep. I'll install a cross brace between the uprights inside the pod to fasten the bundles to.
' style=





' style=

Hinge Installed

Hinge Installed

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.