KitLog pro

Powered By Kitlog Pro v2.0

Safari Helicopter Construction
' style=
Date:  4-22-2007
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Switch Console/Instrument Pod Construction

There are still some details to finish on the switch console and the main instrument pod before I can fully install the panels. The first two photos below show the brackets that secure the main panel to the instrument pod. The last photo shows the right lower side panel support for the center switch console. All of the nutplates are for the removable panel on the right side of the switch console. The support is duplicated for the left lower side, but without the nutplates.
' style=





' style=

Main panel brackets with nutplates installed

Main panel brackets with nutplates installed

' style=

Preparing to back rivet

Preparing to back rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.