KitLog pro

Powered By Kitlog Pro v2.0

Safari Helicopter Construction
' style=
Date:  11-5-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Checking Fit of the Cabin Pieces

Since most of the flight controls are now installed it's time to check the final fit and alignment of the cabin parts. I've been practicing my riveting techniques on scrap, so now it's time for the real thing. I'll do as much back riveting as I can before I have to start bucking. I drilled the hole for the cabin heat in the forward rib. I'll wait to cut the others until I know the exact routing of the ducting.
' style=





' style=




' style=

Installing the cabin heat outlet

Installing the cabin heat outlet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.