KitLog pro

Powered By Kitlog Pro v2.0

Safari Helicopter Construction
' style=
Date:  3-16-2008
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Installed Ignition Harness

Today's work consisted of:

Installing the magneto's ignition harness
Gapping, installing and torqueing the spark plugs
Routing the high voltage lines for the Plasma III ignition system
Installing the Plasma III harness
Installing each CHT probe
Installing the left side of the shroud
Cotter-pinning the engine mount bolts
Installing the left side's rocker covers and drain hose
Installing the crankcase vent tube
Initial fitting of the oil sump
Mounting of the left fuel tank in preparation of installing the fuel probes
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.