KitLog pro

Powered By Kitlog Pro v2.0

Safari Helicopter Construction
' style=
Date:  7-29-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Starting the Wiring

I drilled a few holes for all of the probes and antennas that protrude thru the belly in preparation for the wiring. I installed two outside air temp probes. One came with the kit and the other came with the Dynon D100 EFIS. The Dynon unit will provide real-time density altitude. I also installed an extra anti-collision light on the belly. I probably won't install the pitot tube or the VHF antenna until just before completion to avoid banging into them during construction.

FYI: I used a set of step drills (or Uni-bits) that worked great for drilling these larger holes in the thin metal. Much faster than constantly changing bit sizes.
' style=

Dual OAT sensors, Transponder ant, and Anti-Collision light

Dual OAT sensors, Transponder ant, and Anti-Collision light

' style=

Just the beginning..

Just the beginning..

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.