KitLog pro

Powered By Kitlog Pro v2.0

Safari Helicopter Construction
' style=
Date:  7-7-2006
Number of Hours:  2.50
Manual Reference:  N/A
Brief Description:  Cabin Floor Construction

Since I am installing the electronic throttle governor, the Lamar Master Electrical Control unit (MC10) and the Lightspeed ignition system, I need more room for mounting control boxes. I am going to move the battery to a custom designed support shelf under the instrument pod to free up some room. I have also fabricated an additional floor panel that goes behind the forward panel under the copilots seat.
' style=

Left: rear panel Right: forward panel

Left: rear panel Right: forward panel

' style=

Panels installed

Panels installed

' style=

View from pilots side under seats

View from pilots side under seats

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.