Powered By Kitlog Pro v2.0
RICHARD'S WEB SITE
CH 650B
All
6-16-2019
< Previous Log Entry
Next Log Entry >
Date:
6-16-2019
Number of Hours:
8.25
Manual Reference:
Brief Description:
Left landing gear Mount
Finalized all the drilling for the Left side landing gear mount. All the holes were de-burred and the steel landing gear mount was painted white. Added the inside aluminum parts that are used to reinforce the heal channel on teh floor
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH 650B Home
Category
# Logs
# Hours
All
149
674
Electrical System
1
4
Empennage
9
45
Engine
17
53
Fuselage
64
339
Miscellaneous
2
10
Shop Supplies
2
5
Tools
2
10
Wings
52
208
Copyright © 2001-2024 Matronics. All Rights Reserved.