KitLog pro

Powered By Kitlog Pro v2.0

RICHARD'S WEB SITE
' style=
Date:  8-18-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Crate Engine parts to ship for machining

Built two crates to ship the Engine case and the Crankshaft and Camshaft to Sport Performance Aviation for machining. The case will be cleaned, and the cylinder bores will be increased to accept the larger cylinders of the 3.0L version. The case bolts will be checked and replaced if necessary. The crankshaft will be ground, nitrided and the 5th bearing journal will be added. The camshaft will have the cam timing gear welded.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.