KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  4-22-2012
Number of Hours:  5.27
Manual Reference:  
Brief Description:  Clecoed together the VS, drilled and prepped for p

Today I started on the the vertical stabilizer. This is much like the HS in assembly but about half the work. I began by clecoing the skeletal structure together. Then the rudder brackets were clecoed on. Then I clecoed on the skins.

Now that the entire assembly was held together with the sheet metal fasteners, I drilled out the rear spar with the #30 drill bit. Then I drilled out the ribs and spar flanges with a #40 drill bit. Once this was done then I disassembled the whole thing prepared the edges of the ribs, spars and spar doubler. I also deburred all the holes with the exception of the skin. I will do that tomorrow. I also devinyled the spars and doubler.

There is still some prep work left to do prior to priming but I called it a day after the above.
' style=

Skeletal structure just before clecoing on the skin

Skeletal structure just before clecoing on the skin

' style=

Skeletal structure from other angle

Skeletal structure from other angle

' style=

VS clecoed and drilled out to proper hole size.

VS clecoed and drilled out to proper hole size.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.