Brief Description: Installed crankshaft , cam, case bolts, rear cover
Verified crankshaft main journals were within specification by checking plastiguage marks. Cleaned crankshaft, cam shaft, both case halves. Lubed journals with assembly oil. installed crankshaft. installed camshaft checking that timing marks were aligned. Installed case bolts and torqued to 55 ft/lbs.Lubed cam lobes with cam lobe breakin grease. Checked that crank rotated freely during and after torqueing case bolts. Installed oil slinger onto crankshaft. Installed rear cover. Installed harmonic balancer. Found that balancer bolt had strippen. Found replacement on spare motor. Need 1/2' tap to chase threads in crankshaft.