Brief Description: Rivetted F09 parts in place, started seat sling
A very productive day. I started by pulling the F09 parts from the fuselage so I could rivet much of it on the bench. Then I put the sub assemblles into the fuselage to be rivetted together and to the fuslage. F09 DONE and just the way it should be. Then I turned my attention to F08 which is the seat sling and its assembly. The hinge along the bottom of the sling has been drilled to size and deburred. Tomorrow we rivet. The remaining hinges have been cut to size and pilot holes drilled. My plan is to install the seat with the bottom inge and fit the forward and aft hinges to that