I started by drilling rivets from #2, 3, and 4 vertical channels. The vertical channels were switched left for right and clecoed. The bottom cross ties fit correctly. The upper cross ties appear to fit correctly. The next problem is to fit the cross tie box. That will wait until I recieve the torgue wrench, due in 3-4 days. Then I'll drill the splices to fit the bolt and torque them in place. Then I can fit the cross tie box around the splices.Lastly, I fit the Forward and Aft Push Rod Assemblies in place. Clamped but not drilled. They are centered per the instructions for the Center console