KitLog pro

Powered By Kitlog Pro v2.0

Dick's Web site
' style=
Date:  5-30-2006
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Finishing Fuselage parts

A very productive day!Finally figured out how the longeron splices fit in. Just follow the print, Dick! So I fitted the Upper and lower longeron splices onto both fuselage sides.Then I cut to size and formed the pieces I had laid out on Sunday. Picture 3 shows the fairlead assemblies on the left. I managed to assemble two of the four but stumbled after trying to get the retaining ring on without special tools. I'll figure it out tonite.On the far right of pic 3 is the vertical channel with the holes located midway for the fairlead assembly.to the left of the vert chan are the pieces formed from 0.125 aluminum. The bottom pieces were opened to 95 deg before cutting and drilling. The dome shaped pieces above them are made from 0.125 2024 as OK'ed by Kerry.The arrow shaped pieces are from 0.025 angle, cut length wise and the arrow shape formed.Evrything was deburred.
' style=

Upper Longeron splices

Upper Longeron splices

' style=

Lower Longeron splices.

Lower Longeron splices.

' style=

parts cutout and formed.

parts cutout and formed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.