Channel pieces were laid out, cut where needed, pilot holes drilled and all pieces deburred.These piese need 1" holes in several places. I'm waiting for the proper drill.The phenolic pieces wer cut to size and the four corner holes drilled and countersunk 3/4" per instructions.Next the aft fuselage left and right sides and the aft fuslage cross pieces