Date:  8-15-2007
Number of Hours:  5.00
Manual Reference:  
Brief Description:  elevator

Today the leading edge of the elevator was clecoed into place followed by riveting. Also installed the eleveator control horns. The stabilzer and elevator appear to be done minus their plastic tips whick I'll leave until further down the track. Time to move onto the fuselage!