KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-25-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Delivery of the Savannah kit.

Today I took delivery of my Savannah kit (serial # 06-05-51-499). The first thing to be done was to unpack the crate. Since It was being stored in another hangar at Heck Field we needed to shift all of the parts over to my hangar. The parts were placed up on the mezzanine level in the hangar awaiting an inventory check. The plan is to also use that space for construction. It looks small in the photo but at 12m by 4m it's quite a good size. I can't wait to get into the construction!
' style=

Removing parts from the crate.

Removing parts from the crate.

' style=

Into the ute for transport to my hangar.

Into the ute for transport to my hangar.

' style=

All the parts go upstairs.

All the parts go upstairs.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.