After a long time off the tools I finally got my ass into gear today and finished off the Horizontal stabiliser (minus the tips). very happy with the end result. The tips will be done once the elevator is attached to ensure they flush up. I will be changing the way the inspection panels are attached, replacing the #8 1/2" PHS and tinnerman, with Click bond nutplates and 8-32 1/2" Machine screws.