Powered By Kitlog Pro v2.0
Western-Outbound
S-21 Outbound
All
3-15-2019
< Previous Log Entry
Next Log Entry >
Date:
3-15-2019
Number of Hours:
1.25
Manual Reference:
Section 4
Brief Description:
Horizontal Stabiliser Continued
Finished priming all the parts, assembled as per the manual and all rivets were pulled. the frame was then inserted into the skin for a trial fit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Starlet CJ-1 Home
S-21 Outbound Home
Category
# Logs
# Hours
All
28
47
Elevator
3
8
Horizontal Stabilise
10
16
Inspection
1
Inventory
2
12
Miscellaneous
1
Rudder
4
3
Vertical Stabilizer
7
8
Copyright © 2001-2024 Matronics. All Rights Reserved.