Powered By Kitlog Pro v2.0
Phils Web Site
Onex
Avionics
6-24-2012
< Previous Log Entry
Next Log Entry >
Date:
6-24-2012
Number of Hours:
12.00
Manual Reference:
Brief Description:
Installed Ground Bar/Installed Panel Switches
Derek 6.0 Phil 6.0
Installed the Ground Bus Bar on the firewall.
Made custom battery cables and heat shrink.
Attached Battery Lid to firewall
Cutout holes in the panel for switches
"David Clay" Ground Bar
Ground Bar Installed on Firewall
Left side of Panel. Lighted Rocker Switches
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Onex Home
Category
# Logs
# Hours
All
84
1057
Avionics
10
74
Canopy
6
69
Controls
2
8
Empennage
8
195
Engine
14
172
Firewall
4
44
Fuselage
10
150
Inventory
2
9
Landing Gear
2
18
Miscellaneous
2
None
1
0
Wings
23
318
RV-7 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.