KitLog pro

Powered By Kitlog Pro v2.0

Phils Web Site
' style=
Date:  7-8-2012
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Preparing engine baffling/Laying out Main Bus and

Derek 5.0 Phil 5.0

Met Sunday afternoon at the shop. Phil spent most of the day constructing the Oil Cooler Baffle Plenum. Polished and prepared the other engine compartment air baffles. Cut hole in aft fence for top mounted oil cooler exit.


Installed engine mount and torque locked. Ready for the new engine coming home soon!

Derek worked on the wiring schematic and circuit breakers. Fabricated a bus bar out of a flattened piece of small diameter copper pipe (ice maker size) Drillled holes and connected the circuit breakers to it. Drilled holes in a scrap piece of aluminum to set the distance apart for the circuit breakers before transfering them to the panel.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.