Phil out of town for Philips graduation until around noon. Derek fabricated and installed brackets from a piece of angle to make attach points for the Feniex light bar. Drilled hole and installed grommet for the wire to come up through the floor.
Spent several hours after lunch making a battery box from the plans. Found the bottom to be too short. After re-measuring everything and showing to be correct we looked at the drawing revisions on the Sonex website and sure enough found there to be a diminsion revision that screwed us up. We have to learn to check the revisions first!!! Oh well.. it was good practice!
Installed LED Lightbar on belly in front of landing gear