KitLog pro

Powered By Kitlog Pro v2.0

Peterson Bearhawk
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-18-2023
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Repair of Citabria 7KCAB - 2

We continue to work on the Citabria, at this point the RH wing is almost fully assembled and both ailerons are covered. Once we have the RH completed we will proceed to cover both wings using the Stewarts Covering System.

In the images I show a segment of the fixed LE being installed which is one of the STCs offerred by Millman along with the aluminum spar STC. The other picture is of the aircraft fuselage on which we have completed a lot of fabric repair along the belly and replaced the cabin floor panels.
' style=

Installing new fixed LE per STC

Installing new fixed LE per STC

' style=

View of fuselage

View of fuselage

' style=

New cabin floor panels

New cabin floor panels

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.