KitLog pro

Powered By Kitlog Pro v2.0

Peterson Bearhawk
' style=
Date:  5-14-2022
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Engine Cowling - Pt 25

I installed the NACA ducts onto the lower engine cowling with sealant. Then I proceeded to complete the fabrication of the oil access door doubler then drilled and countersunk the fastener holes. I am using #3 rivets with a 1" spacing.
' style=

NACA duct installed in cowling

NACA duct installed in cowling

' style=

Upper cowling drilled up for doubler

Upper cowling drilled up for doubler

' style=

Doubler and door painted

Doubler and door painted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.