KitLog pro

Powered By Kitlog Pro v2.0

Peterson Bearhawk
' style=
Date:  1-25-2020
Number of Hours:  8.50
Manual Reference:  
Brief Description:  Bottom boot cowl - Pt 2

I completed fitting and drilling up the bottom boot cowl, tunnel, and the two lower side panels located below the side boot cowls. At this point, all metal pieces of the boot cowling components have been located and pilot drilled.

Next step is to bring all fastener holes up to final size, dimple all applicable fastener holes, and complete the final trimming and deburring of all pieces.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.