KitLog pro

Powered By Kitlog Pro v2.0

PETER'S WEB SITE
' style=
Date:  11-28-2009
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Started on right flap

Start of right and last flap today. I started by smoothing all parts. This took about 2.5 hours. I then clecoed the parts together and match drilled everything together including the 2 small FL708 spacers that fit between bottom skin and end ribs (Image #3 below). Instead of making this part exactly to dimension on drawing, I cut the part longer than required at first to simplify positioning the part between bottom skin and rib to match drill. After the parts were matched drilled, I cut the part to the dimension given in the drawing maintaining the edge distance….. much easier this way.
' style=





' style=

Right flap all match drilled in V jig

Right flap all match drilled in V jig

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.